With the advent of renovation in Archicad 15, the transition from existing conditions to new construction is much simpler. We still want to finalize and set aside the existing conditions before moving on.
Searched for "renovation"
8 Results
Several different kinds of change, which may overlap. New versions mean new workflows, and that means layer changes.
Here is a massing model showing existing conditions and a proposed addition. It is mostly done with renovation filters, with a couple of tweaks from graphic overrides. Existing is overridden with one surface, the light color in the picture. If you are OK with existing elements not having fills in elevation, you can leave this override on. If you want
Note: The favorites part of this is different in Archicad 20. With the advent of renovation in Archicad 15, the transition from existing conditions to new construction is much simpler. We still want to finalize and set aside the existing conditions before moving on.
First, to review: The New Construction renovation filter has these settings: Existing: Override Demolished: Hide New: Show In plan, new walls are gray and existing walls are white. Demolished elements are hidden. When you demolish an opening in an existing wall, the opening disappears and is replaced by a piece of wall whose status is new. I think this behavior
We reviewed some things that people were a little sketchy on. Which libraries should you use • The current version's Archicad Library, which is located in the Applications folder, at Graphisoft/Archicad [n]. When you migrate a project to a newer version, you might also pick up an Archicad [n-1] Migration Library. • The current version's Rill Library, which is located
Typically we try to get the existing conditions completed before starting demolition and new construction. It's good practice to save a copy of the PLN at this stage, along with a PDF of the existing plans. But in principle, we should be able to get existing plans out of the project at any stage, and there might be projects
Renovation is a feature set to control the display of existing, new, and demolished elements in the workflow of addition and renovation projects. It began in Archicad 15. This feature means we no longer have three of each layer in addition projects. In the Renovation workflow, there are three kinds of elements: Existing Elements, Elements to be Demolished, and New